Guide to Facilities Using the Kobelco Eco-Solutions System
Chubu-Kamikita Clean Center
This facility was the first fluidized-bed gasification and melting system to go into operation.
| Name of facility |
Chubu-Kamikita Clean Center |
| Capacity |
60 t/day (30 t/24 h x 2 units) |
| Completed |
October 2000 |
Pollution Control Criteria
| Total Dust |
0.01 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
20 ppm or less |
| Nitrogen Oxides(NOx) |
150 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.1 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(261KB)
Aki Clean Center
| Name of facility |
Aki Clean Center |
| Capacity |
130 t/day (65 t/24 h x 2 units) |
| Waste heat boiler steam conditions |
30 kg/cm²G x 300 ˚C |
| Electric Power Generating capacity |
1300 kW |
| Completed |
November 2002 |
Pollution Control Criteria
| Total Dust |
0.01 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
20 ppm or less |
| Nitrogen Oxides(NOx) |
50 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less |
| Dioxins |
0.1 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(248KB)
Environmental Sanitation Center, Waste Treatment Facility
| Name of facility |
Environmental Sanitation Center, Waste Treatment Facility |
| Operated by |
Kazuno City Administrative Association |
| Capacity |
60 t/day (30 t/24 h x 2 units) |
| Completed |
November 2002 |
Pollution Control Criteria
| Total Dust |
0.02 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
20 ppm or less |
| Nitrogen Oxides(NOx) |
100 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.05 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(351KB)
Ishinomaki Area Clean Center
| Name of facility |
Ishinomaki Area Clean Center |
| Capacity |
230 t/day (115 t/24 h x 2 units) |
| Waste heat boiler steam conditions |
30 kg/cm²G x 300 ˚C |
| Generating capacity |
2600 kW |
| Completed |
March 2003 |
Pollution Control Criteria
| Total Dust |
0.02 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
50 ppm or less |
| Nitrogen Oxides(NOx) |
60 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.01 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(645KB)
Nakatsugawa Municipal Environmental Center
| Name of facility |
Nakatsugawa Municipal Environmental Center |
| Capacity |
98 t/day (49 t/24 h x 2 units) |
| Waste heat boiler steam conditions |
30 kg/cm²G x 300 ˚C |
| Generating capacity |
900 kW |
| Completed |
March 2004 |
Pollution Control Criteria
| Total Dust |
0.02 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
50 ppm or less |
| Nitrogen Oxides(NOx) |
100 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.1 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(339KB)
Ono-Katsuyama Plant (View Clean Okuetsu)
| Name of facility |
Ono-Katsuyama Plant (View Clean Okuetsu) |
| Capacity |
84 t/day (42 t/24 h x 2 units) |
| Waste heat boiler steam conditions |
17 kg/cm²G x 206 ˚C |
| Completed |
June 2006 |
Pollution Control Criteria
| Total Dust |
0.01 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
50 ppm or less |
| Nitrogen Oxides(NOx) |
100 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.1 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(270KB)
Nemuro-Hokubu Area MSW Treatment Facility
| Name of facility |
Nemuro-Hokubu Area MSW Treatment Facility |
| Capacity |
62 t/day (31 t/24 h x 2 units) |
| Completed |
February 2007 |
Pollution Control Criteria
| Total Dust |
0.02 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
100 ppm or less |
| Sulfur Oxides(SOx) |
100 ppm or less |
| Nitrogen Oxides(NOx) |
150 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.1 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(294KB)
Sashima Clean Center
| Name of facility |
Sashima Clean Center |
| Capacity |
206 t/day (103 t/24 h x 2 units) |
| Generating capacity |
3000 kW |
| Completed |
March 2008 |
Pollution Control Criteria
| Total Dust |
0.01 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
10 ppm or less |
| Sulfur Oxides(SOx) |
10 ppm or less |
| Nitrogen Oxides(NOx) |
50 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.01 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(821KB)
Iwade Clean Center (provisional)
| Name of facility |
Iwade Clean Center (provisional) |
| Capacity |
60 t/day (30 t/24 h x 2 units) |
| Scheduled completion |
December 2008 |
Pollution Control Criteria
| Total Dust |
0.01 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
50 ppm or less |
| Sulfur Oxides(SOx) |
20 ppm or less |
| Nitrogen Oxides(NOx) |
100 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.05 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(270KB)
Sagamihara Plant
| Name of facility |
Sagamihara Plant |
| Capacity |
525 t/day (175 t/24 h x 3 units) |
| Generating capacity |
10,000 kW |
| Scheduled completion |
March 2010 |
Pollution Control Criteria
| Soot and Dust |
0.005 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
10 ppm or less |
| Sulfur Oxides(SOx) |
10 ppm or less |
| Nitrogen Oxides(NOx) |
30 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less (avg. value for 4 hrs.) |
| Dioxins |
0.05 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(273KB)
Kawagoe Plant
| Name of facility |
Kawagoe Plant |
| Capacity |
265 t/day (132.5 t/24 h x 2 units) |
| Scheduled completion |
March 2008 |
Pollution Control Criteria
| Total Dust |
0.02 g/Nm³ or less |
| Hydrogen Chloride(HC1) |
10 ppm or less |
| Sulfur Oxides(SOx) |
10 ppm or less |
| Nitrogen Oxides(NOx) |
50 ppm or less |
| Carbon Monoxide(CO) |
30 ppm or less(avg.value for 4 hrs.) |
| Dioxins |
0.005 ng-TEQ/Nm³ or less |
System Flow Diagram
Download(1.51MB)