The above shows the process flow of the centralized wastewater treatment facility in the Long Duc Industrial Park.
100% our subsidiary Kobelco Eco-solutions Vietnam (KESV) constructed and has been responsible for O&M of the facility.
Discharged waste water is collected at pump pit, and then Equalized in EQ tank. Afterwards, waste water is treated in each tank and finally released to the river.
Waste water after the treatment is at the almost same level as the river water.
The facility takes an important role for the IP to harmonize with the surrounding society.
For inquiries, please complete and send in an inquiry form.